[PATCH 0/2] Add support for downstream port reset(DPR)

From: Sanath S
Date: Tue Dec 12 2023 - 09:01:38 EST


Tunnels created by boot firmware results in incorrect PCI resource
allocation, which results in failure of extending daisy chain.

This series aligns with windows behaviour of performing a teardown of
tunnels and resetting the downstream ports using DPR during the init
sequence.

Sanath S (2):
thunderbolt: Introduce tb_switch_reset_ports(), tb_port_reset() and
usb4_port_reset()
thunderbolt: Teardown tunnels and reset downstream ports created by
boot firmware

drivers/thunderbolt/switch.c | 31 ++++++++
drivers/thunderbolt/tb.c | 137 ++--------------------------------
drivers/thunderbolt/tb.h | 2 +
drivers/thunderbolt/tb_regs.h | 1 +
drivers/thunderbolt/usb4.c | 39 ++++++++++
5 files changed, 80 insertions(+), 130 deletions(-)

--
2.34.1