[PATCH] sched: reassign prev and switch_count when

From: Yong Zhang
Date: Mon Jan 11 2010 - 01:21:25 EST


Assume A->B schedule is processing, if B have acquired BKL before and
it need reschedule this time. Then on B's context, it will go to
need_resched_nonpreemptible for reschedule. But at this time, prev
and switch_count are related to A. It's wrong and will lead to
incorrect scheduler statistics.

Signed-off-by: Yong Zhang <yong.zhang0@xxxxxxxxx>
---
kernel/sched.c | 5 ++++-
1 files changed, 4 insertions(+), 1 deletions(-)

diff --git a/kernel/sched.c b/kernel/sched.c
index c535cc4..4508fe7 100644
--- a/kernel/sched.c
+++ b/kernel/sched.c
@@ -5530,8 +5530,11 @@ need_resched_nonpreemptible:

post_schedule(rq);

- if (unlikely(reacquire_kernel_lock(current) < 0))
+ if (unlikely(reacquire_kernel_lock(current) < 0)) {
+ prev = rq->curr;
+ switch_count = &prev->nivcsw;
goto need_resched_nonpreemptible;
+ }

preempt_enable_no_resched();
if (need_resched())
--
1.6.3.3
--
To unsubscribe from this list: send the line "unsubscribe linux-kernel" in
the body of a message to majordomo@xxxxxxxxxxxxxxx
More majordomo info at http://vger.kernel.org/majordomo-info.html
Please read the FAQ at http://www.tux.org/lkml/